Audio is of a presentation to American Institute of Aeronautics and Astronautics (AIAA), not an interview. Discusses the history and role of the European Space Agency (ESA) and its connection to Spacelab and NASA.

Source

University of Alabama in Huntsville Archives and Special Collections, Huntsville, Alabama

Rights

This material may be protected under U. S. Copyright Law (Title 17, U.S. Code) which governs the making of photocopies or reproductions of copyrighted materials. You may use the digitized material for private study, scholarship, or research. Though the University of Alabama in Huntsville Archives and Special Collections has physical ownership of the material in its collections, in some cases we may not own the copyright to the material. It is the patron's obligation to determine and satisfy copyright restrictions when publishing or otherwise distributing materials found in our collections.

Format

.MP4

Language

en

Type

Interviews
Audio

Identifier

ohc_crst_000020_A

Oral History Item Type Metadata

Interviewee

Rees, Eberhard

Transcription

[00:00:10] Eberhard Rees: Thank you, Jack. I think you overdid it a little bit.

[00:00:20] ER: Dave Christensen had to been trying to get me to this presentation since December last year, and I just couldn't be available for this. He lured me into it because he said this is an informal discussion with you rather than a presentation. But now standing here in front of these microphones, I have the feeling it is a presentation, actually. As Jack Lee said, I'm a consultant with the ERNO Corporation, prime contractor of the Spacelab in Germany.

[00:01:01] ER: It is not too easy to be a consultant. I want to tell you a little story. Friends of ours, they had a big, beautiful tomcat, and they told us that they are not satisfied with that cat because that cat is now going out every night. So, we said, well, why don't you have that cat castrated? When we met them again, we asked them, how is now the cat? Does the cat still go out? And they said, unfortunately, the cat is now going out as a consultant. [crowd laughs]

[00:01:49] ER: Originally, Dave Christensen did not want me to talk to you about the European Spacelab, but rather about the European Space Program. I'm going to talk to you a little bit about that, and then as an example, go into the Spacelab. I'm not going to describe it technically to you. This would be too long, but it would be very interesting. So, I suggest for further meetings of AIAA that you take the Spacelab and have – if you are interested in technical details – it chopped off into the subsystems, and then some other people maybe from Marshall Space Flight Center under Jack Lee could give you presentations about the subsystems. This would be highly interesting.

[00:02:43] ER: So, I am giving you only an overall view about the management of the Spacelab. Historically, over there in Europe, after the event of space flight, as you know how that started actually with Sputnik, and then we had the Explorer Number One here, which was developed by Marshall Space Flight Center and the Jet Propulsion Laboratory in Pasadena. European countries, especially France, Germany, and England, went then also into space flight. But since they were mostly interested in launch vehicles, they first started to develop launch vehicles. They set up two organizations. The one was ELDO, European Launcher Development Organization, and ESRO, European Space Research Organization, both seated in Paris. And with these two organizations, they started a kind of a combined space program. Of course, the various countries in Europe had their own little program, but they could only do certain experiments.

[00:04:08] ER: So, when it came to a launch vehicle, which they wanted to do, they started the Europa1, 2, and Europa 3. This was under the [adjunct?] of ELDO, actually. In order to get the countries together, they founded European Space Consortiums. The one was S.T.A.R. STAR, the other one was COSMOS, C.O.S.M.O.S., and the third one was MESH, M.E.S.H. These consonants mean names of firms, of companies in these countries. So, with these consortiums and with the two organizations, ELDO and ESRO, they started into programs mainly as to Europa 1, 2, and 3.

[00:05:08] ER: The first launch vehicles were made ready and were, I think, launched in Woomera, Australia. And it was rather unsuccessful. I do not know whether they launched two or three of those, but they had big trouble. The first stage was an English stage out of the Blue Streak rocket. England right after the war started, of course, rocketry also as military devices. And they had developed the Blue Streak rocket, which they took then as the first stage. The second stage was a French rocket. I forgot the name. Maybe somebody of you knows that. And the third stage was a West German rocket. And the guidance system and the telemetry system were developed in Holland and Belgium. And the whole thing to be launched in Woomera.

[00:06:14] ER: So, you see, systems engineering became quite important. And I believe, I do not know in detail anymore why all these launches failed, but I believe it was mainly a matter of systems engineering. Later on, when they discarded Europa 1 and 2, they came to Europa 3 and started another attempt with that. They launched that from the famous launching site, Kourou, in French Guiana, South America. And the French were very eager, and I believe this was the main reason why they continued this Europa 3, to have something launched from Kourou. Kourou has the advantage that's close to the equator for geostationary satellites. That Kourou was about to die because it was monetary, not too well supported. And all the other countries, or many of the other countries, felt they should launch their payloads on American satellites. But the French kept that very strong, and so they are on again after Europa 1, 2 and 3 was discarded. Again, a launch vehicle, which is the Ariane. I come to that later on.

[00:07:43] ER: After the disaster with the Europa launch vehicles, ELDO was discarded, and the only space organization was then ESRO left. In the meantime, we had these great successes in the United States, and after this low in Europe, Europeans came again and wanted to participate with the United States in the post Apollo program, namely on the shuttle. I remember some of the Europeans of the old ELDO still came over here and talked to us about what part of the shuttle they could take, and first we talked about that they would take that transfer stage from Earth orbit into a geosynchronous orbit. The British, the Germans, and the French at that time made quite some proposals, but later on the United States was not in favor of having these countries participate in this upper stage. Then we talked about that they would participate just in the shuttle, making wings or tail fins or things like that, which of course was not intriguing to the Europeans either. I also felt it would have been just wrong to do that.

[00:09:13] ER: So finally, we came to that so-called sortie mission at that time, which was a mission for about 15 days. Today it's now 7 days, just flying certain sortie experiments. This seems to NASA as the best package we could give to the Europeans NASA was short in money. The Europeans offered that they would do that with their own money. NASA and the Europeans also felt very keenly to cooperate with the Europeans. NASA cooperated in the Apollo-Soyuz even with the Russians. So, we finally settled for that. The only guy who was unhappy about it was me because I wanted to have this Spacelab built in Huntsville. I had felt we could have done it real well as we did the ATM. We had then this monetary trouble. As you know, we had these strong [rift actions?] and we just couldn't do that anymore. NASA just threw me out when I was in Washington to have this done in Huntsville.

[00:10:34] ER: So finally, the Spacelab was actually then enacted. It was first under ESRO and then the Europeans felt after they had that Spacelab that they should create a kind of a space agency as we have it in NASA in the United States. And they established ESA, ESA, European Space Agency, not administration, they call it agency. They started talking about it in 1972 and it was actually established in 1974. The seat is in Paris and the director general is a Britisher with the name of Roy Gibson. They have about 300 employees at headquarters in Paris and have in the entire agency about 1600 people. So, this is quite a sizable organization. Most of these people are in ESTEC. ESTEC is a kind of a center as NASA has centers in Holland, in Noordwijk, Holland. And the Spacelab program is under ESA also managed out of ESTEC at Noordwijk. The Marshall space flight people know that place real well.

[00:12:13] ER: I think I start now telling you a little bit about the overall European program and I'd like to have this chart number one. As you can see to the left, there are all the programs and there are strange abbreviations. In 1977, you see about five launches. Can you see this triangles there? Five launches they want to do in 1977 of the GEOS, the IUE, the SEE-B, EXOSAT. We'll start in 1978 and continue then. Then there's Meteosat, which is going to be launched hopefully in ‘77 on a Thor Delta, I guess. And then AeroSat was just established about the end of ‘76. But that's a communication and [nautical?] controls satellite for airplane traffic and they have a little bit trouble with the United States in this particular area. So, I do not know whether it had really started here or not. Then comes MAROTS, that's Maritime Orbital Test Satellite and then OTS Orbital Test Satellite, which is going to be launched in ‘77. Then comes ECS, European Communication Satellite, which they want to start in 1977. I do not know whether they have done that. Then comes famous Spacelab, which was started way back there. And we are now in the middle of the program here.

[00:14:27] ER: The so-called preliminary design reviews were all finished in 1976. First here, kind of unsuccessful as the Marshall people know. And here in December, quite successful. And the ERNO people, I come to that later, were very happy that it worked out finally here. And it's going to be delivered in the middle of 1979 and is going to be launched in 1980. Not in the mid-80s as I read it first, but in the middle of 1980. And the second one later in 1980. This is of course a launching which should mainly prove the systems and not too much scientific research will come out of this. And then finally here comes the Ariane, another launch vehicle which is especially promoted by the French people. Test flight here and another test flight here. And it has about, I think, 1,600 pounds on a geosynchronous orbit, actually. I think that's the figure. And then come more test flight of this. The Europeans very heavily think of this as the European launch vehicle for geosynchronous satellites but also for others.

[00:16:03] ER: Now you might ask me the question what these abbreviations all mean. And I can read it to you. So that GEOS, which was part of that STAR consortium, is a geostationary research satellite with a two-yield mission. Research on distribution of thermic plasma of low energy particles and magnetic and electrical fields. Then the IUE is International Ultraviolet Explorer together with NASA and the United Kingdom. Measurements of ultraviolet spectrum of 1,150 to 3,200 angstroms. ISEE is International Sun-Earth Explorer which is a project between NASA and ESA. NASA builds ISEE A and C and the Europeans’ ESA, the B, which is listed there. A and B strongly eccentric orbits. The orbit around the sun goes to the points of the solar earth system. And the mission is a measurement of the magnetic fields. Then the EXOSAT which is developed by the COSMOS consortium X-ray observation satellite. Establishing of radiation sources of X-rays launching 1980 on the Thor Delta or on the Ariane already. It has a similar mission as the HEO which we are going to launch at the end of June. Then the Meteosat is a weather satellite as the word says geostationary orbit over the Atlantic. The AeroSat aeronautical satellite for communication with airplanes en route, and as I said the program has difficulties with the United States FAA. It is not going at the present time. No prediction when problems will be resolved. So, they are working hard in the field of politics there. MAROTS is maritime orbital telecom satellite. Geostationary over the Indian Ocean. OTS is orbital telecom satellite. ECS European communication satellite. So, you see the Europeans are quite strongly going on communication.

[00:18:52] ER: And then comes finally that Ariane down there. And that's a three-stage launch vehicle. On the first stage they have four engines, 60,000 kilopounds thrust each, 144 tons propellants, UDMH, nitrogen tetroxide. And the developer of the first stage is France. They have also the prime contractor for the whole thing. Because as I said they are very much interested in having something launched at that Kourou station, which might be a good thing. But the other Europeans still don't want to pay too much for it. And to run such a launch site as we have at the Cape down there costs quite some money even if nothing is being launched. The second stage is a one engine of the same engines of the four engines of the first stage. The thrust is 75,000 kilopounds in vacuum. And the developer is Germany. The third stage is a high energy stage, liquid hydrogen, liquid oxygen. And the total launch weight is 207 metric tons. As I said the payload weight in a geosynchronous orbit is 1,693 kilograms.
[00:20:28] ER: Now let me go to the next chart. Here you see what the Europeans are spending. And you see on the other end here some strange figures which are called million accounting units. Since the German nations have British pounds, Swiss francs, French francs, German marks Italian lira they have to have a combined monetary system for these programs. And they have set the so-called AU or accounting unit. In the years 1974 and 1975, an accounting unit was about $1.2. And in the year ’76 - ‘77 it's about $1.35. Is that about right Jack?

[00:21:32] Jack Lee[?]: [muffled and distant speaking] [It’s closer to one?].

[00:21:35] ER: It's supposed to go down to one?

[00:21:36] JL[?]: [inaudible]

[00:21:38] ER: So, it was $1.3 in the earlier years and now it was then in 1976 $1.2.

[00:21:44] JL[?]: [distant] It went from 1.2 to 1.3 and back down.

[00:21:48] ER: And it's going back down now. Why is this so? I do not know but they have people who know that. Yeah, it's a complicated thing. I asked the people in Germany quite a bit about it and never got a satisfactory answer. Anyhow they are talking about in this MAUs, million accounting units, and the highest figure they intend to go or have gone is about 450. Now here are the various programs they are having and this big one in the early years was ELDO, the Europa missiles. Launches I talked about. Then they had two. This was something small sounding rocket launch range in Sweden. This is probably just their operations there without the direct launching of anything. I do not know that. Then comes number three. That's the famous Kourou what the Europeans have to pay. The French of course pay the major amount of it. Then comes four which is the Ariane launcher. We here were of the opinion that the biggest thing is number five namely the Spacelab but that is not so in the European program. And when I saw this chart, I was amazed that our Spacelab was not about 50% of the total. Then comes six, seven, eight, nine, ten. What is nine? Let me see. It’s that AeroSat I talked about which is at the present time in trouble. Then comes ten. That's in general scientific programs under ten. This is the participation of the Europeans on experiments also on the Spacelab. Number 11 is the administrative money they need, I guess. [General budget?] they call this. Then of course they would not want to go down. They want to have something for the future so you have to transpose this on top of it 12 and 13 which would this can be a little bit different. Go over 3,020 million accounting units so it would go down about to here. But Europeans hope that it will go down only to 400 and then stay about constant here depending mainly on the scientific experiments.

[00:24:42] ER: So far for this chart by the way if you have any questions while the chart is on why don't you ask it. I'd be glad to answer it if I can.
Now the next chart. This shows just one of these consortiums and since the ERNO Corporation I am consulting with is in that MESH consortium I show you this chart here. This was a telecommunication development satellite which was launched early in March ‘72. This is that OTS as you could see in that chart, they proposed to launch it in June. Will they do it? I do not know. Then this is that MAROTS and they hope to launch that in 1978, October.

[00:25:47] ER: What I want to show you on this chart are not this artist’s concept but rather one of these consortiums and MESH means Matra, ERNO, Saab, Hawker Siddeley Dynamics and then later on the MESH program – the MESH consortium was joined by Air Italia in Torino, by INTA in Spain and by Fokker VFW. Also, ERNO is also part of VFW-Fokker. The Fokker company in the Netherlands had special interest to participate from their side in the MESH program and then later on even American companies went in TRW systems and was then also part of MESH. The next chart please.

[00:26:47] ER: I come now to this post-Apollo program namely the Spacelab. The Spacelab was actually started under ESRO already and when ESRO was discarded it was then of course continued and made strong by ESA. And this is the way the contractual situation of the Spacelab is looking. It looks rather complicated and unfortunately, it is rather complicated. So, you see here Europe and USA and they had an early agreement, European Space Consortium, how they would work together. The countries, I think there are 10 – 1, 2, 3, 4, 5, 6, 7, 8, 9, 10. Ten countries are involved in that Spacelab. Here is the United States and NASA and their relations. And when then ESA was created there was an agreement or an arrangement between European nations and ESA written in this here, in this document. And there was then a document which is the important document in our cooperation between NASA and ESA.

[00:28:37] ER: Now I have this memorandum here. It is about 16 pages and I just don't want to read the 16 pages to you. But it's quite interesting and I can tell you in a few words about what it comprises. First of course, Europeans had to know what the shuttle is and what the United States [in that soddy?] mission or rather Spacelab want them to do. They had described about the requirements very shortly. Then there is a chapter on the interface with the shuttle. Then the use objective for what the Spacelab is to be used. Then how it ought to be run, namely a Phase B study, then Phase D, a completion schedule. And there is also a chapter what would happen if there are changes. Then program plans are being described. Then especially there is a longer chapter what is the respective responsibility of ESA versus NASA. This is quite interesting but it's very long and I don't want to bother you with that. Then they want to have established the program heads, that means an overall program manager. Then project managers. Then they had established a joint Spacelab working group which is quite important. They talk about liaison, cooperation and then especially the cost, very important, that the United States pays their cost on the shuttle. It is not written that if the United States changed requirements that the United States would also pay that. I have never understood that right but also ESA all the time said, “Well we have to pay this unfortunately, but we see these requirements are important. And so, we will honor these requirements.” And Jack I'm right with that?

[00:31:08] JL[?]: There’s a fairly good reason though. The reason for not paying it is because of the Parliament transferring the funds between the US and the Europeans [is prohibited?] in the country defense agreement and [inaudible]. So, we both recognize [inaudible] the development, [the argument, and the income?]. [The secondary factors that affects us included kind of balance it out?].

[00:31:33] ER: So, it will be some time eventually paid in a way. Because the Europeans are having now trouble, as you know how these programs are. Programs like this might run over. So far, they have only I think spent 45% of the total but when you want to go out to the end of the program and estimate it then they might have difficulties getting that money together. And now running again from Paris to France, Italy, Germany, Spain, Switzerland and get additional money is very very very hard. It's almost impossible. They have also certain rules that what they would do if 100% is overrun and certain rules what they would do if 120% – goes over 120%. Anyhow this is the cost.

[00:32:34] ER: Then comes the NASA procurement. So far NASA will buy an engineering model. I think that's going to be delivered to Huntsville or is it now going to be delivered to the Cape? I do not know that.

[00:32:54] JL[?]: Just to the Cape.

[00:32:55] ER: Just to the Cape. Not — you know originally it was supposed to go to Huntsville.

[00:32:59] JL[?]: [inaudible] we don’t [buy it?] [inaudible].

[00:33:05] ER: So, this is not quite decided yet, or is it?

[00:33:08] JL[?]: [It’s gonna go to the Cape, yeah].

[00:33:10] ER: And then comes one flight unit and that flight unit goes directly to the Cape. And as you know the Marshall Space Flight Center just awarded McDonnell Douglas with a contract for the integration of the Spacelab into the shuttle at the Cape. Then come other things in this agreement as to design changes, then access to technology and assistance by NASA. There has been always quite a debate in the United States how far technology should be made available to other countries. Of course, when we launched this Apollo-Soyuz we just had to give certain insight in our design also to the Russians. And we finally got also the Russians giving us insight in their Soyuz because they had to fit together and since our astronauts had to go into the Soyuz, they wanted to be safe in there so NASA insisted that the design of the Soyuz is safe. Russians insisted that our command module is also safe. Also, they knew from the many lunar landings that it was quite safe but they wanted to have that technology and there was a certain exchange in technology. And then came the point how much more technology in the field of space flight we want to give to the Europeans.

[00:34:53] ER: Now in the mind of NASA there was never any doubt that we have to support them. A hundred percent was our technology otherwise we would have bought a thing of the technology of the year 1950 or so. So, in the meantime we have developed so much and explored so much technology. We had also made so many mistakes and we want the Europeans to avoid those by just giving them all the technology. So as to technology transfer for the Spacelab I do not believe we have any restrictions whatsoever. Anyhow there is a paragraph written about this too in the agreement or rather memorandum of understanding.

[00:35:47] ER: And then of course there is quality control and acceptance established facilitation of export licenses. Then use of United States facilities, joint definition of areas and then comes actually the principles concerning access and use of shuttle Spacelab. And there the Europeans of course are keenly interested in, for instance that was I think that number 11. I think it was number 11 on that— no number 10 on that chart that they are in on the experiments. So they are keenly interested in the use of the Spacelab and they also want to have some scientists not astronauts but scientists flown in the Spacelab in the laboratories on their own experiments. And there was even talk that they would also furnish here and there an astronaut. Of course, the question came immediately up, males or females and the decision is actually there that also female scientists but probably no astronauts are being admitted.

[00:37:12] ER: So, this is about the whole memorandum of understanding. Of course, there is an article in public information then patents and proprietary information and it was signed on the 14th of August 1973. So, this was very important, it took quite some time of dealing this memorandum of understanding out and it finally worked then. Then based on that, ESA or rather ESTEC wrote an RFP, a request for proposal and since Germany pays about 53% of the whole thing it was agreed that the prime contract would go to Germany. The STAR consortium was eliminated earlier so it was only just the companies of the various countries competing with each other of the COSMOS and the MESH. And the prime contractor was then for the MESH consortium, ERNO and the prime contractor for the COSMOS, Messerschmitt-Bölkow, that ‘M’ stands in COSMOS, Messerschmitt-Bölkow-Blom. So there was competition between these two prime contractors and every one of these prime contractors got assigned out of these 10 countries so and so many companies. I come to that later. So, it was a competition of the primes and the so-called co-contractors. These other co-contractors were not called sub-contractors but co-contractors because it was felt that it was politically better not to have these companies report as a sub-contractor to a German prime contractor.

[00:39:34] ER: Why is it so? I do not understand but it was just felt this way. It might be easier for them to swallow that.] I do not know. Actually, the contracts are just a prime contract and sub-contracts. And here finally the competition was then won by ERNO. What came out in the point rating was about practically the same. Messerschmitt-Bölkow had I think some 20 or 30 points out of 1000 points more. And for any reason this is a North German company and Messerschmitt-Bölkow is a South German company and more of this aerospace business is probably around Munich or Friedrichshafen, other places in South Germany. This was probably one point and they want to keep a competition alive. Messerschmitt-Bölkow is a rather strong company and has many other jobs. ERNO is not as strong so this was for them a good shot in the arm to get the company going and they do quite a good job in that Spacelab. So, this is about all what I can say here. The next chart please.
[00:41:23] ER: This came out of the competition, I said it before. ERNO is part of a large company, VFW-Fokker, which is a combined between, as I said before, the famous Fokker planes of World War I already and VFW. Here is ESA, here is ESTEC. [ESEC?] wrote as I said the RFP and the contract came out here but it took about a year or even longer until the contract was finally written. And ERNO just started working on that thing without a contract. As we know that from Marshal Space Flight Center, we had this quite often in other programs. The total company, VFW-Fokker, limited, comprise about 17,000 employees and 1.6 billion [D-Marks?] turnover in 1976. This is not too significant a chart for you here. This is the company structure of VFW-Fokker and here is the ERNO company which is actually the space flight company. They are building airplanes or components or doing other things. And here is ERNO, the prime contractor which was then selected, which is the space flight department of the main company. Next slide please.

[00:43:22] ER: This is a very interesting chart which shows one of the difficulties we have in this combination of countries working together. The participation of a country is here in percentages and this is the total of the money divided among the countries. What they pay in ESA has to give them, or rather ERNO as the prime contractor, in contracts. And it was stated before ESA was even graded that 80% of the money a country pays in for some space flight undertaking should also go to a company in their country. So West Germany having paid 53.3%, prime contractor ERNO I think had about 35% or so of the total, if I'm not mistaken of this 53%. Then there is AEG-Telefunken, Dornier Systems, then comes Air Italia, Belgium, France – 10% is the third, you see the Italians paid in most – then comes France, then comes Great Britain United Kingdom, 6.3%, then comes Belgium with two companies. Ground support equipment and incidental equipment which is an air-conditioned container for the pallet mode. I come to that later. In Spain, which has now been changed to another company with the name of SENER. Then comes here the Netherlands 2.1%, Denmark and Switzerland subcontract, they are subcontractor mainly to Matra I guess. And finally, Austria came running and also want to participate after they said before, “No they would not want to participate,” and so we had to cut out 0.8% for them out of all the other contracts which is always very painful. Now all these companies or countries, here are the companies, here are the countries have to get now work according to these percentages. And this was very very painful, we call this the geographic distribution. And then Italians for instance are making the structure of the module, the pressurized module, and that doesn't cost quite 18% of the money. But it was estimated being less. So, Fokker in the Netherlands gave them the manufacturing of the airlock which is on top of the whole module. And this is not too good an arrangement and so on.

[00:46:53] ER: There comes another thing which causes trouble and is the fixed price. When we here in our projects used fixed price only really for subcontracts or when you were building more but even in the Saturn where we built quite some few stages, we never put that out for fixed price contracts. But the Europeans felt that it would be most cost effective if most of the contracts in development contracts should be put out on fixed price contracts. I think in the bidding process between Messerschmitt- Bölkow and ERNO, ERNO had a little bit less on fixed price than Bölkow and that gave Bölkow some more points. And when I saw that first, I was just flabbergasted that this development contracts are being put out on fixed price. And this is now something we are suffering a little bit under it that for instance these people here who are making the network are developing that on fixed price. This is very difficult because such a network is being changed constantly according to the black boxes. It has to connect. As a matter of fact, this contract or this work should have been done by the prime contractor. We just can't imagine here from all our experience that the electric network is done by another contractor – who as you understand that in AEG, the companies in Hamburg, make all their cables up in Hamburg and then bringing down to Bremen and believe they would fit. So, we have now created a development fixture and we get them now more and more and more to Bremen actually and they are working now on the point turning over that fixed price contract in a cost-plus contract. This is now in the middle and seems to work out. So, this geographical distribution causes a lot of difficulties.

[00:49:12] ER: Here you have the same thing again on this map, and you see what the various contractors are doing. These are the major components or what we call subsystems. Here is the prime in Bremen. Here are these electrical people in Hamburg. [?], they make software. This is another rather difficult thing in this whole array of companies making the software for the checkout for instance. Especially the electrical support equipment is made by Bell Telephone Manufacturing in Belgium is run by software. Now the main software is done in Bremen alright, but the [?] people in Norway have a co-contract on software. Software had caused us quite some headaches in the Apollo program, and the people in Washington had blamed us in Huntsville that we are not taking care properly of the software business. We always had felt the software would come along finally, and it finally did. How? I do not know but finally it came along. The problem with software is all the time. First you have to wait until you have the design of the hardware and then you have to with that design of the hardware, write out the software in the particular language and then when the hardware is built the software should be available already there in order to check out the hardware and this is what caused all the time difficulties.

[00:51:05] ER: Furthermore, some very few people understand software really well, and with ERNO and all these other companies, software is just not understood too well. But the problem is that the NASA people here in Marshall Space Flight Center and in headquarters are very much concerned about the software problem which might then later on show up when we do the major assembly which we call integration of the whole thing in Bremen. Somehow or other based on the experience we had in the Apollo program I am not so much worried about the software. I am not so worried about the people here and the people in NASA headquarters but I am worried a little bit. Anyhow it is a problem this whole thing. Now let me not go through the subsystems but as I said before it would be if you are interested in details, technical details, it would be very helpful if, for instance, Jack Lee would make the one or the other man of his people make available for going into all these very interesting subsystems here and explain them in detail.

[00:52:29] ER: Now I guess my time is now mainly up. It is getting later than I thought. Get some of these charts here to show you the space lab which you probably know. So here you see, well I now show the first one. You see here the space lab in the shuttle and we have basically two modes. The one is the module and the pallet. I show you that later and here is only a pallet mode which is nothing but a platform on which you can put telescopes on observing free space without the restriction of a pressurized compartment and we can fly also the pressurized module only. The scientists or the technicians go through this channel and they can fly through into this pressurized module by the way this channel and here is an escape hatch in case of trouble is being done in the United States and contracted out by the Marshall Space Flight Center.

[00:53:50] ER: The next, here you see the pressurized module. Here again this tunnel going into the pressurized model and this is what we call pallets, these platforms which can house telescope or earth observation equipment. And this here is a kind of an airlock through which experiments in outer space can be shot out on a longer boom or shorter boom exposed to space for some time then pull in again. The next chart, here you see this [equipped?] the pallet with all kinds of gadgetry. Here this are long booms going out with certain sensors here. It would go too far if I would go all in this. It would of course be also very valuable for you if experiments sometimes could be presented to you. I do not know how far the experiments are now for the first flight. We had in ERNO also felt we should be farther along with the experiments in order to check out the Spacelab. But I believe to make the scheme is now that the experiments are being built in only at the Cape, is that so? Or would some experiments really be built in in ERNO?

[00:55:32] Distant Speaker [possibly Jack Lee]: [inaudible] considered mostly experiments being installed [in racks and on pallets?] [inaudible] level for integration [inaudible] which would be away from the Cape. [inaudible] and how much it is, [is a detail?] that we can [expend?] [for being installed in Europe?]. Right now, today, there are experiments being installed north of [inaudible].

[00:55:55] ER: But the racks then sent to Bremen back there to the Cape. So, there I see quite an integration. I would rather, if you ask me I am advisor only as I said before, I would rather have those racks in Bremen so that you really can check out the whole business real well because there you get another interface if you do it at the Cape. Well but take it or leave it, it is advice from a consultant.

[00:56:29] ER: Here you see again this platform here, this what we call a pallet. This is made in England in Great Britain. We have a little bit of trouble there because this is becoming quite hot and has to be insulated real well. And let me give you now some dimensions of that space lab. The payload bay of the shuttle is 18 meters long and the module diameter, this is the diameter, now the model isn't here anymore, is 4 meters about. Then the weights. You know the shuttle originally, and still today, can carry 65,000 American pounds into an Earth orbit which is 29,500 kilograms. But the payload weight as we found out later can only be taken down and the payload weight for launching is 15,500 and the space lab weight plus mission payload is 11,400 kilograms. So, it goes rather down. Then the space lab net weight is only 2,300 which is quite a restriction on that. And this had caused us quite some problem especially when we have that only pallet mode. But it looks to us as we could make it and there is quite some safety margin still in the whole system. So, our worries have in the last year subsided a little bit but they are still there.

[00:58:34] ER: Then the last chapter I want to give you is the major problems as I see them. From what I have said, you can imagine that the management of such a program with ten nations is not very easy. We do not have too much trouble with the language. The uppermost people speak all English real well. I was amazed how well they are all doing in these companies. But as soon as you go farther down on the shop level and when it comes to writing inspection sheets or processing sheets, it has to be done in the language of that country. And in the transfer from one language to the other language there could be difficulties. Some of the people especially from McDonnell Douglas are concerned about that. I talked the other day to the quality men from them and he is concerned about this particular problem. But it is not a major problem. Very strangely we have a problem with telephoning. If I want to talk to ERNO in Germany I just go to telephone and get it in a minute. But when you want to telephone from Germany, Bremen to Italy, Torino, you really got the problem. And this is the major, the 18 percent, and the module structure and the thermal control are technically rather complicated. So, the way we used to work on the Apollo program was just over the telephone and daily many, many, many phone calls. And with Italy you just can't talk. It takes quite some time to go down. So, the European telephone system is not as good as the telephone system overseas between Germany and NASA. With England it's going better, with France it's going better, but it's especially bad with Italy which is the largest co-contractor. So, when I was in Italy with them, I just, when we had a problem came, I said why don't you go to the phone and call Mr. so-and-so up in Bremen. Then he said “Oh well for heaven's sake, forget about that. We can get through only sometime tomorrow morning.” So this is one trouble spot.

[01:01:12] ER: The biggest trouble spot, after my opinion, is the so-called engineering change proposals, the ECP. And this has caused us tremendous trouble because some of these changes had taken about 16 months, 18 months until they went through the system. Because the system where it was important change is rather long, especially when it comes to a change of interface between the shuttle and Spacelab. There is NASA headquarters, Marshall Space Flight Center, Johnson Space Center, then comes ESA in Paris.

[01:01:54] [recording cuts]

[01:02:07] ER: In the cost plus fixed price it's a fixed award. It's a little bit easier, the whole thing. But these ECPs have caused us a lot of trouble and in some cases it would have been easier if the technical people just would have been allowed to say, “All right we need that so make it.” Rather than going with that thing through a huge mill which costs more money than that change would have cost. And there are some changes, take an electric change where that Matra Corporation in France is somewhere here. And that goes right away in the software, that goes right away in that electric ground support equipment. It goes even in the structure and it might go even into this environmental control system of strongly. So, you have to call companies and companies and companies until you have that thing through. And some people don't like it. This causes a lot of trouble. When we had the Apollo program and Dr. von Braun was here, he would not even have known what an ECP is. And we just by a good collocation of people with our contractors were able to straighten that out on lower levels and only when real major changes, changing the whole configuration came up we finally got then the upper staff in these things. This is not so in this program here. So, we have been bleeding of collocation.

[01:03:55] ER: Then the big test is going to be the end of this year or next year, next year which is the integration, what we call here assembly. When all these components or subsystems come to Bremen and have to be integrated in a total system. And I'm much worried about that. It's very difficult. We have to have detailed people from all these companies in Bremen. We also want to do that check out and test and integration together with the ESA people and the Marshall people. And then finally comes a document out of accepting the whole thing. Now if the subsystems coming out from the various co-contractors are not perfect so that the wealth doesn't work properly then we really have trouble. So we have to insist, it costs quite some money, but we have to insist that every subsystem from each and every of these companies in each and every of these countries is 100% all right and meets the specifications. And I personally am quite worried of the whole system. I have also written my fingers bloody on that one.

[01:05:20] ER: Then comes finally the money overrun which we might face, we might not face but so far we have not talked too much about it and we might make the 100%. I believe we are able to stay at least below the 120%. But our experience here was of course a little bit different. And we will never have it so good and nobody else will have it ever so good as we had it in the Apollo program when the President Kennedy at that time said we want to land men on the moon and get them back. And this was then agreed by everybody at that time and then somebody asked well how much would that cost? Mr. Webb and Dr. Siemens at that time said, “Well we do not know that we even do not know how to go on the moon yet but it will be between 20 and 40 billions,” and then we said well that's all right. So, we had the cover of 40 billions and we finally made it I think below 20 billions. If you discount all the facilities which we built with that money which is still there or the stages we had available for the Skylab and all those things we stayed below the 20 billion even. But it was a nice cover the whole thing and I wish the Europeans would have that and Jack I wish you had that for the shuttle and for the Spacelab. It looks different. In Europe we have also to talk to the scientists and to the public quite strongly because space flight is not written anymore in capital letters as it was formerly when we landed on the moon or had the Skylab. Very unfortunately. And the people in Europe even believe less in space flight as they do in this country. Which is my personal finding when I talk to people over there. So, it takes a strong PA effort also to sell space flight to the people and I believe that that space lab is really one big breakthrough in space flight. Thank you so much.

[01:08:01] Unidentified Speaker [possibly Jack Lee?]: Thank you very much, Dr. Rees for [that program today and for everybody coming?] I want to thank Dr. Nick Costas who helped me all year in putting these programs on. I see he even made it today. I wasn't sure if he would but we do want to recognize all of his efforts in these tech panel meetings. Thank you.

[01:08:23] ER[?]: It was a little bit longer than I thought.

[01:08:25] Unidentified Speaker: It’s okay, it was extremely interesting.

[01:08:27] ER[?]: Don’t write everything down, [inaudible] speaking…

[01:08:32] Unidentified Speaker: It was very informative.

[1:08:33 – 1:15:07] [white noise]
[END]